Project: Great Ocean Road -150kN Screw Pile Installation and Footing Excavation

Year: 2024
Location: Great Ocean Road
Scope of Work: This project entails the excavation of footings, along with the supply, transportation, and installation of 150kN screw piles.
Value: $64,000.00
Challenges: Operating a 10-ton machine on an incline and installing 60 screw piles in a confined space.
Collaborating with multiple contractors in a limited work area.