Year: 2018 Location:Catholic College in Sunshine Scope of Work: Design, fabricate, supply, deliver, install, and certify screw piles of 100kN, 250kN, and 400kN for retrofitting an existing Assembly Hall at a Catholic College. The project includes demolition, jackhammering, digging footings, and installing screw piles within a 10mm tolerance Value:$130,000.00 Challenges: The region is known for its basalt, and integrating a subfloor with an existing structure demands both patience and expertise. Duration:6 months