Project: Catholic College-100kN, 250kN & 400kN Screw Pile Installation

Year: 2018
Location: Catholic College in Sunshine
Scope of Work: Design, fabricate, supply, deliver, install, and certify screw piles of 100kN, 250kN, and 400kN for retrofitting an existing Assembly Hall at a Catholic College. The project includes demolition, jackhammering, digging footings, and installing screw piles within a 10mm tolerance
Value: $130,000.00
Challenges: The region is known for its basalt, and integrating a subfloor with an existing structure demands both patience and expertise.
Duration: 6 months